Services

TAB work defined around your project.

We confirm the systems, measurement requirements, access and deliverables before field work. Special testing and commissioning support are included only when agreed in the project scope.

Airside

Airside testing, adjusting & balancing.

From the air-handling unit to the final device.

We document the test setup, operating conditions, measurements and final adjustments so the project team can review the result.

  • Air-handling units, rooftop units, makeup-air units and dedicated outdoor-air systems
  • VAV terminals, fan-powered boxes and fan-coil units
  • Supply, return, exhaust and outside-air devices
  • Duct traverses and system verification where required
  • Commercial kitchen airflow testing and verification when specified

Hydronic

Hydronic systems with clear measurement records.

A documented view of water flow and system operation.

The project defines equipment coverage, operating modes and acceptance criteria. Manufacturer data and approved measurement arrangements guide the work.

  • Pumps, coils and balancing valves
  • Heat exchangers and distribution systems
  • Valve, pressure, temperature and flow records as applicable
  • TAB-related measurements for chillers, cooling towers and boilers when specified
  • Final settings and conditions affecting the result

Additional scope

Verification and coordination.

01

Room pressure

Room-pressure measurements under the operating conditions and criteria specified for the project.

02

Duct leakage

Duct air leakage testing when specified, using the approved test scope and acceptance criteria.

03

Commissioning support

TAB verification, witness coordination and related closeout documentation as contracted. Broader controls commissioning responsibilities remain defined by the project.

Let’s plan your TAB scope

Start with the right information.

Send your plans, specifications, location and schedule. We’ll review the requested work with you.

Request a TAB proposal